The Scope Gap Index  /  Division 13

Division 13 · Special Construction · Q3 2026

What Scope Agent flagged in special construction scope packages

39 Division 13 packages across 21 projects, generated between 17 July and 30 September 2026 for Provision customers, ranked by how often each job got flagged. Model flags, checked by a person on fewer than one item in a hundred. Where to look, not proof.

39

Division 13 packages across 21 projects, 17 July to 30 September 2026

34

of 39 had at least one flag from Scope Agent

229

flags in total: 191 inferred, 38 coordination

18

packages flagged for testing, inspection and certification, all 18 as inferred

Inferred means Scope Agent judged the job necessary and found no scope naming who does it. Coordination means it judged the job to sit between two trades. Neither is a confirmed omission on that project.

Ranked

Anchors lead, testing follows, and neither names a trade

Prefabricated structures, modular units, pools. Scope Agent flagged an anchor, embed or connection in 20 of 39 packages, 18 as inferred: the modular box lands on the foundation and the documents don’t say who sets the anchor bolts or who grouts the gap. Testing is second at 18, every one inferred: the pool pressure test, the factory inspection of the module, the third-party certification the building department wants to see.

Job flaggedPackagesInferredCoordinationShare flagged
Anchors, embeds and connections18 inferred · 5 coordination20 of 3918551%
Testing, inspection and certification18 inferred · 0 coordination18 of 3918046%
Blocking, backing and support11 inferred · 5 coordination15 of 3911538%
Sealants, flashing and waterproofing joints10 inferred · 3 coordination11 of 3910328%
Tolerances, joints and trade interfaces10 inferred · 1 coordination11 of 3910128%
Temporary protection6 inferred · 0 coordination6 of 396015%
Utility and service connections4 inferred · 2 coordination6 of 394215%
Openings, cutting and patching2 inferred · 3 coordination5 of 392313%
Penetrations, sleeves and firestopping5 inferred · 1 coordination5 of 395113%
Cleaning4 inferred · 0 coordination4 of 394010%
Maintenance, warranty and spares4 inferred · 0 coordination4 of 394010%
Hoisting, lifting and delivery2 inferred · 0 coordination2 of 39205%
Removal, demolition and disposal1 inferred · 0 coordination1 of 39103%
Scaffolding, shoring and access1 inferred · 0 coordination1 of 39103%
Shop drawings and submittals1 inferred · 0 coordination1 of 39103%

“Inferred” and “coordination” count packages with that kind of flag, and a package can have both, so the two columns can add to more than the total. The generic supply-versus-install topic (25 of 39) is left out; see the method note.

Beyond the ranking

Three things the table doesn’t tell you

1. Five in six flags were inferred

Of 229 flags, 191 were inferred and 38 coordination. A special construction package is usually a manufacturer’s scope, written around the product, and the site work that receives the product is where the flags land.

2. Five of 39 packages got no flag

Thirty-four packages had at least one flag, 87 percent. As with equipment, a package that reads supply and deliver gives Scope Agent nothing to flag. The setting, connecting and testing live somewhere else, or nowhere.

3. Blocking and sealants are where the box meets the building

Blocking, backing and support drew 15 flags, 11 inferred and five coordination. Sealants drew 11, ten inferred and three coordination. The joint where the modular unit meets the site-built corridor, the sealant at the pool coping, the backing for the prefabricated canopy. Each one is a hand-off the documents show without naming.

The items in detail

What each flag usually points at, and how to close it in the scope

The six jobs flagged most often, after the generic supply-versus-install topic. Check your own documents before assuming a flag is right.

Anchors, embeds and connectionsflagged in 20 of 39 packages

Anchor bolts and embeds in the foundation for the prefabricated structure, the connection between modules, the pool shell to the deck, the service connections to the unit. Eighteen inferred, five coordination. Name who supplies and sets each anchor, who surveys it, and who makes each connection.

Testing, inspection and certificationflagged in 18 of 39 packages

Factory and field inspection of modular units, the pool pressure and leak test, third-party certification, the engineer’s letter the authority wants. All 18 flags were inferred. Make each test and certificate a deliverable with a named trade.

Blocking, backing and supportflagged in 15 of 39 packages

Temporary support for modules during set, backing in the module walls for site-installed items, the bearing for a prefabricated canopy. Eleven inferred, five coordination. Say who supports what and until when.

Sealants, flashing and waterproofing jointsflagged in 11 of 39 packages

The joint between modules and between module and site-built work, the pool coping sealant, the flashing where the prefabricated roof meets the main roof. Ten inferred, three coordination. Name the trade that seals each interface.

Tolerances, joints and trade interfacesflagged in 11 of 39 packages

Foundation tolerances the module setter needs, the gap between modules, the pool shell against the deck finish. Ten inferred, one coordination. State the tolerances and who verifies before the set.

Temporary protectionflagged in 6 of 39 packages

Protecting set modules before the envelope is closed, and protecting the finished pool through the rest of the job. All six flags were inferred. Say who protects and for how long.

Writing the package rather than checking it? The scope of work template covers the structure every subcontract needs, and the subcontractor scope examples show how the boundaries read when they’re written down.

Method

How we counted

39 scope packages classified to MasterFormat Division 13, generated by Scope Agent between 17 July and 30 September 2026 on 21 of the 24 projects in the quarter’s cohort. Nine carried the trade label special construction, eight prefabricated structures, seven modular manufacturers, and nine a pool or swimming pool label. Six more carried a customer-specific label we couldn’t map to a standard trade; they’re counted here because the package itself was coded to the division. A package is one trade on one project, as it stood at quarter end. An item counts when Scope Agent flagged it as inferred or coordination. We grouped the items into sixteen topics by keyword, and one item can land in more than one topic.

39 packages on 21 projects clears our 20-package threshold for publishing a division, and one package moves a share by about three points, so treat the ranking as an order and the percentages loosely. These are Provision customers’ projects, and the numbers describe this sample only. A flag is Scope Agent’s judgment, checked by a person on fewer than one item in a hundred, so some flags will be wrong. We’ll update it every quarter.

See what Scope Agent flags in your own special construction package

Upload your drawings and specs. Scope Agent flags the inferred and coordination scope before the bid leaves your office, and your estimator decides what’s real.