The Scope Gap Index  /  Division 12

Division 12 · Furnishings · Q3 2026

What Scope Agent flagged in furnishings scope packages

53 Division 12 packages across 21 projects, generated between 17 July and 30 September 2026 for Provision customers, ranked by how often each job got flagged. Model flags, checked by a person on fewer than one item in a hundred. Where to look, not proof.

53

Division 12 packages across 21 projects, 17 July to 30 September 2026

50

of 53 had at least one flag from Scope Agent

267

flags in total: 229 inferred, 38 coordination

34%

the most any one job was flagged, the lowest top share of any division

Inferred means Scope Agent judged the job necessary and found no scope naming who does it. Coordination means it judged the job to sit between two trades. Neither is a confirmed omission on that project.

Ranked

Nothing dominates, and that is the finding

Furnishings has the flattest ranking on the Index. The most-flagged jobs, blocking and temporary protection, tie at 18 of 53 packages, roughly a third, and no other division tops out that low. Window treatments, FF&E, countertops and casework are late, light packages, and what they leave out is spread thin: the backing for the blind bracket, who protects the countertop until turnover, who takes the roller shade into a room the drawings gave no pocket.

Job flaggedPackagesInferredCoordinationShare flagged
Blocking, backing and support18 inferred · 3 coordination18 of 5318334%
Temporary protection18 inferred · 0 coordination18 of 5318034%
Openings, cutting and patching11 inferred · 3 coordination14 of 5311326%
Tolerances, joints and trade interfaces13 inferred · 0 coordination13 of 5313025%
Anchors, embeds and connections9 inferred · 2 coordination10 of 539219%
Hoisting, lifting and delivery9 inferred · 1 coordination10 of 539119%
Sealants, flashing and waterproofing joints10 inferred · 0 coordination10 of 5310019%
Removal, demolition and disposal9 inferred · 0 coordination9 of 539017%
Scaffolding, shoring and access8 inferred · 0 coordination8 of 538015%
Testing, inspection and certification8 inferred · 0 coordination8 of 538015%
Penetrations, sleeves and firestopping4 inferred · 0 coordination4 of 53408%
Cleaning3 inferred · 0 coordination3 of 53306%
Maintenance, warranty and spares3 inferred · 0 coordination3 of 53306%
Shop drawings and submittals2 inferred · 1 coordination3 of 53216%
Utility and service connections1 inferred · 1 coordination2 of 53114%

“Inferred” and “coordination” count packages with that kind of flag, and a package can have both, so the two columns can add to more than the total. The generic supply-versus-install topic (36 of 53) is left out; see the method note.

Beyond the ranking

Three things the table doesn’t tell you

1. Six in seven flags were inferred

Of 267 flags, 229 were inferred and 38 coordination. A furnishings package is usually the last one in, with nobody working behind it, so there’s rarely a second trade to point at. The documents name the item and no trade for the job beside it.

2. Temporary protection: 18 flags, 18 inferred, none coordination

The countertop goes in before the painter’s last coat. The blinds go up before the glazing sub’s final clean. Eighteen packages were flagged for protecting that work and none of the flags named a second trade. Say who covers it and until when.

3. Blocking is flagged 18 times in a division that never installs it

Blind brackets, wall-hung casework, the TV mount, the entrance mat frame recessed in the slab. Eighteen packages were flagged, 18 as inferred and three as coordination. The furnishings sub assumes the backing is there. The framer was never told.

The items in detail

What each flag usually points at, and how to close it in the scope

The six jobs flagged most often, after the generic supply-versus-install topic. Check your own documents before assuming a flag is right.

Blocking, backing and supportflagged in 18 of 53 packages

Backing for blind and drapery brackets, wall-hung casework and shelving, the recess for the entrance mat, the support for a heavy countertop overhang. Eighteen inferred, three coordination. Put a backing schedule in the framing scope keyed to the furnishings drawings.

Temporary protectionflagged in 18 of 53 packages

Protecting countertops, casework and window treatments installed before the finish trades are done. All 18 flags were inferred. Say who protects what, with what, and until when.

Openings, cutting and patchingflagged in 14 of 53 packages

Cut-outs in countertops for sinks and appliances, the pocket for the roller shade, the recess for the mat frame, patching after the casework is set. Eleven inferred, three coordination. Name who cuts and who patches, and who templates the countertop.

Tolerances, joints and trade interfacesflagged in 13 of 53 packages

Wall plumb and flatness the casework sub needs, the window dimensions the blind sub ordered to, the joint between countertop and splash. All 13 flags were inferred. Specify the tolerances by element and say who field-measures.

Anchors, embeds and connectionsflagged in 10 of 53 packages

Anchoring casework to the wall, the mat frame to the slab, the plumbing and electrical connection at the lab bench. Nine inferred, two coordination. Name who anchors and who connects.

Hoisting, lifting and deliveryflagged in 10 of 53 packages

Getting furniture, casework and countertops into a finished building: the elevator, the protection on the route, the crew to carry. Nine inferred, one coordination. Say who delivers to the room, not just to the site.

Writing the package rather than checking it? The millwork scope of work guide covers casework and countertops, and the scope of work template covers the structure every subcontract needs.

Method

How we counted

53 scope packages classified to MasterFormat Division 12, generated by Scope Agent between 17 July and 30 September 2026 on 21 of the 24 projects in the quarter’s cohort. Seventeen carried a window treatment label, 13 FF&E, six entrance mats, four countertops, three lab casework, and one each furnishings and residential casework. Eight more carried a customer-specific label we couldn’t map to a standard trade; they’re counted here because the package itself was coded to the division. A package is one trade on one project, as it stood at quarter end, so a project typically contributes two or three furnishings packages. An item counts when Scope Agent flagged it as inferred or coordination. We grouped the items into sixteen topics by keyword, and one item can land in more than one topic.

53 packages on 21 projects clears our 20-package threshold for publishing a division, and one package moves a share by about two points. With nothing flagged in more than 18 packages, the order of the table is loose: a couple of packages would reshuffle the top six. These are Provision customers’ projects, and the numbers describe this sample only. A flag is Scope Agent’s judgment, checked by a person on fewer than one item in a hundred, so some flags will be wrong. We’ll update it every quarter.